November 2023

NOVEMBER MEETING: The next regular meeting of the Page Township Board of Supervisors will be held on Monday, November 20 at 6:00pm. The meeting agenda is posted in the Google Drive.

REMOTE CONNECTION: Members of the public may participate in the meeting remotely. A Zoom connection is available https://us02web.zoom.us/j/87480600464?pwd=QVVNa2N3V1ZaVGMzbzcrUm03Wkc4dz09 or phone audio at (312) 626-6799 — ID 874 8060 0464   Passcode: 935459

PAST MEETINGS: Meeting minutes are posted online once they have been approved by the Supervisors at the subsequent meeting. September meeting minutes are now posted in the Google Drive.

October 2023

OCTOBER MEETING: The next regular meeting of the Page Township Board of Supervisors will be held on Monday, October 16 at 6:00pm. The meeting agenda is posted in the Google Drive.

REMOTE CONNECTION: Members of the public may participate in the meeting remotely. A Zoom connection is available https://us02web.zoom.us/j/87480600464?pwd=QVVNa2N3V1ZaVGMzbzcrUm03Wkc4dz09 or phone audio at (312) 626-6799 — ID 874 8060 0464   Passcode: 935459

ADOPTING NOVEMBER TOWN ELECTIONS: At the October meeting, Supervisors will consider adopting a resolution to transition to November Township elections, subject to a vote of approval by voters at the March 2024 Township election.

PAST MEETINGS: Meeting minutes are posted online once they have been approved by the Supervisors at the subsequent meeting. August meeting minutes are now posted in the Google Drive.

2023-24 Snow Plowing: Request for Quotes

Snow Removal Quotes

Page Township will be accepting quotes for snow removal for the 2023-2024 season.  Quotes should include an hourly rate and equipment to be used for snow removal of approximately 22.5 miles of Township roads as per the Township plowing policy (see below), available from the Clerk.  Quotes must be submitted October 16, 2023 at 6 PM at the monthly meeting.  Certificate of insurance is required.  Page Town Board reserves the right to reject any or all quotes. 

Quotes may also be sent to:

Page Township Clerk

21804- 140th Avenue

Milaca  MN  56353

clerk@PageTownship.org (320) 247-5030

Snow Plow Policy

Snow & Ice Removal: The Town shall have all roads passable within a reasonable amount of time after a snowfall has stopped but does not assure a completely bare road.

a.  Dispatching of Snowplow:  The Town may dispatch snowplow(s) on Township roads during or after snow events. The Township will usually not dispatch the snowplow until after 3” of snow has fallen. The snowplow will not be sent out in situations that may be hazardous due to restricted visibility.

b. Operations:  Generally, the cleaning of roads will consist of three phases:  (1) making the road passable; (2) widening; and (3) cleaning up. Depending on the situation, more than one phase may be accomplished at one time.

c. Personal Property: Mailboxes and fences damaged during snow plowing will be evaluated case by case. Only those mailboxes with a proper swing-away post which were damaged by actual contact with the snow plowing equipment maybe repaired at the Township’s expense.

It is unlawful to plow snow from driveways onto or across public roads. Piles of snow left on or near the road can freeze into a solid mass creating a hazardous situation for vehicles and snowplows. Accidents and damages caused by snow piles placed in the roadway may result in liability to the property owner.

The Town’s snow plowing contractor will not attempt to remove stuck vehicles from ditches, snow banks, or any other impediment. When directed by a Supervisor, the Town’s snow plowing contractor will make an emergency plowing effort through private property.

September 2023

SEPTEMBER MEETING: The next regular meeting of the Page Township Board of Supervisors will be held on Monday, September 18 at 6:00pm. The meeting agenda is posted in the Google Drive.

REMOTE CONNECTION: Members of the public may participate in the meeting remotely. A Zoom connection is available https://us02web.zoom.us/j/87480600464?pwd=QVVNa2N3V1ZaVGMzbzcrUm03Wkc4dz09 or phone audio at (312) 626-6799 — ID 874 8060 0464   Passcode: 935459

PAST MEETINGS: Meeting minutes are posted online once they have been approved by the Supervisors at the subsequent meeting. July meeting minutes are now posted in the Google Drive.

August 2023

AUGUST MEETING: The next regular meeting of the Page Township Board of Supervisors will be held on Monday, August 21 at 6:00pm. The meeting agenda is posted in the Google Drive.

REMOTE CONNECTION: Members of the public may participate in the meeting remotely. A Zoom connection is available https://us02web.zoom.us/j/87480600464?pwd=QVVNa2N3V1ZaVGMzbzcrUm03Wkc4dz09 or phone audio at (312) 626-6799 — ID 874 8060 0464   Passcode: 935459

PAST MEETINGS: Meeting minutes are posted online once they have been approved by the Supervisors at the subsequent meeting. June meeting minutes are now posted in the Google Drive.

July 2023

JULY MEETING: The next regular meeting of the Page Township Board of Supervisors will be held on Monday, July 17 at 6:00pm. It will also be the Board’s annual reorganization to select new officers and set policies for the next year. The meeting agenda is posted in the Google Drive.

REMOTE CONNECTION: Members of the public may participate in the meeting remotely. A Zoom connection is available https://us02web.zoom.us/j/87480600464?pwd=QVVNa2N3V1ZaVGMzbzcrUm03Wkc4dz09 or phone audio at (312) 626-6799 — ID 874 8060 0464   Passcode: 935459

Supervisor Burk will be participating via remote video connection from 10781 White Orchard Ct NE, Turtle River, MN 56601

FIBER INTERNET: East Central Energy (ECE) has committed to bringing high-speed, fiber optic internet to all residences within their service area. At this time, they expect to add service in Page Township sometime between 2024-2027. The Town Board encourages you to submit your interest in service through their online form to demonstrate demand and move our area sooner in the installation window. Visit ecefiber.com to register and learn more.

PAST MEETINGS: Meeting minutes are posted online once they have been approved by the Supervisors at the subsequent meeting. May meeting minutes are now posted in the Google Drive.

HALL RENTAL: The Town Hall is available for public rental. Hall rental forms and availability calendar are available online.

April 2023

APRIL MEETING: The next regular meeting of the Page Township Board of Supervisors will be held on Monday, April 17 at 6:00pm. It will also be the Board’s annual reorganization to select new officers and set policies for the next year. The meeting agenda is posted in the Google Drive.

REMOTE CONNECTION: Members of the public may participate in the meeting remotely. A Zoom connection is available https://us02web.zoom.us/j/88056539810?pwd=QRAxumlSNYPm3CfCx8xrY4DACRM4ip.1 or phone audio at (312) 626-6799 — ID 880 5653 9810   Passcode: 045578

PROPERTY VALUE & CLASSIFICATION: The Page Township Board of Supervisors will meet with the Mille Lacs County Assessor to conduct the Board of Appeal and Equalization on Tuesday, April 25 at 9:00am. This is an opportunity for landowners to appeal the assessed value or classification of their property. Appointments must be made with the Mille Lacs County Assessor at (320) 983-8311.

ROAD REVIEW: Supervisors will be completing the 2023 review of all Township roads and rights-of-way after the Board of Appeal on April 25. Please notify the Clerk if you have particular concerns that should be looked into. The road review determines priorities for maintenance and improvements for the remainder of the year.

FIBER INTERNET: East Central Energy (ECE) has committed to bringing high-speed, fiber optic internet to all residences within their service area. At this time, they expect to add service in Page Township sometime between 2024-2027. The Town Board encourages you to submit your interest in service through their online form to demonstrate demand and move our area sooner in the installation window. Visit ecefiber.com to register and learn more.

PAST MEETINGS: Meeting minutes are posted online once they have been approved by the Supervisors at the subsequent meeting. February meeting minutes are now posted in the Google Drive.

HALL RENTAL: The Town Hall is available for public rental. Hall rental forms and availability calendar are available online.

Board of Appeal & Equalization

Important Information Regarding Property Assessments
This may affect your 2024 property taxes

The Board of Appeal and Equalization for Page Township will meet on April 25, 9:00am at the Page Township Hall (21804 – 140th Ave, Milaca). The purpose of the meeting is to determine whether property in the jurisdiction has been properly valued and classified by the Mille Lacs County Assessor. If you believe the value or classification of your property is incorrect, contact the Assessor’s office (320-983-8311) to discuss your concerns. If you disagree with the value or classification after discussing it with the Assessor, you may appear before the Page Township Board of Appeal and Equalization. The Board will review your assessments and may make corrections as needed. Appointments are required. You must appeal the to the local Board before appealing to the County Board of Appeal and Equalization.

March 2023

Page Township Update
March 2023

MARCH MEETING: The next regular meeting of the Page Township Board of Supervisors will be held on Monday, March 20 at 6:00pm. The meeting agenda is posted in the Google Drive.

REMOTE CONNECTION: Members of the public may participate in the meeting remotely. A Zoom connection is available https://us02web.zoom.us/j/88056539810?pwd=QRAxumlSNYPm3CfCx8xrY4DACRM4ip.1 or phone audio at (312) 626-6799 — ID 880 5653 9810   Passcode: 045578

GRAVEL & GRADING: During the March meeting, Supervisors will be reviewing quotes for gravel and grading servings. The gravel request is for up to 6,000 yards of modified class 5 delivered, spread, and packed upon designated town roads. The grading request covers biweekly grading of all road miles, which excludes 170th Ave this year (Lakin Township is responsible).

ELECTION RESULTS: The annual election of Township officers was held on March 14th from 5 – 8pm. Winning seats officers were: Laura Murphy (Treasurer) with 9 votes and Jason Theisen (Supervisor A) with 6 write-in votes. During the annual meeting that night, residents proposed that the Board consider adopting November elections on the regular state ballot. Any change would have to be approved at a future township election.

2024 PROPERTY TAXES: During the Annual Meeting, residents approved the Supervisors’ recommended 2024 property tax levy of $142,000, which is unchanged from 2023. Individual fund areas were re-balanced largely due to higher fire coverage costs from the City of Milaca. Materials provided at the meeting are available for review.

PAST MEETINGS: Meeting minutes are posted online once they have been approved by the Supervisors at the subsequent meeting. January meeting minutes are now posted in the Google Drive.

HALL RENTAL: The Town Hall is available for public rental. Hall rental forms and availability calendar are available online.

2023 Grading: Request for Quotes

Page Township seeks QUOTES for road grading for 2023. Road grading must be performed according to specifications of the Town Board, available from the Clerk. Written quotes must include:

(1) Lump sum rate for each pass of the full 22 miles (more or less) of road. Each pass will be done approximately every other week throughout the season as conditions allow.

(2) Hourly rate for additional, more frequent or grading of certain road sections on-call as requested by the Town

Include with quotes a description of equipment to be used. All quotes must be submitted electronically or delivered to 21804 140th Ave, Milaca 56353 (US Mail or dropbox) with a current Certificate of Insurance ($1.5 million liability) by March 20, 2023 at 6:00 PM. Quotes will be read at the Regular Board Meeting held that evening. The Page Township Board reserves the right to reject any or all quotes. Selected contractor must sign contract and provide W-9. Contact Kyle Weimann, Township Clerk at 320-247-5030 or clerk@PageTownship.org.

DRAFT CONTRACT / SPECIFICATIONS

2023 GRADING SERVICES CONTRACT

This agreement (“Agreement”) is dated this 20th day of March, 2023, and is by and between Page Township, Mille Lacs County, Minnesota, 21804 – 140th Avenue, Milaca, MN, (“Town”), and , (“Contractor”), of _ (mailing address). In consideration of the mutual promises and agreements hereinafter set forth, and intending to be legally bound, the parties do hereby agree as follows:

  1. Services. Contractor will provide regular and special road grading services in accordance with the proposal as awarded based on the attached Grading Request For Quotes at the March 20, 2023 Regular Board Meeting. The Contractor is solely responsible for providing all necessary personnel and for providing and maintaining the equipment necessary to perform the services. Contractor will perform such services in a timely and competent fashion and will take all steps necessary to protect the public from injury arising from Contractor’s performance under this Agreement.
    a. Grading of all 22 miles shall be completed every other week as conditions allow and be billed as a lump sum. — $XXXXX/pass
    b. Additional grading at the Town’s request shall be billed hourly. — $XXXX/hour
  2. Specifications. Contractor will perform grading services to meet the following specifications. Deviations from these specifications may be approved by the Town as authorized by the Town’s designated representative.
    a. Only complete grading during such times as conditions allow to prevent or minimize damage to the roadway.
    b. Complete full pass within 2 calendar days every other week as conditions allow. This is inclusive of all township roads, including turn-around areas and excluding 170th Ave and Minimum Maintenance Roads, and includes turn-around areas.
    c. Do not grade areas where dust control has been approved by the Town, unless otherwise directed.
    d. Contractor will notify the Town’s designated representative at least 24 hours in advance of beginning grading and upon completion.
    e. Angle grade of road away from centerline without leaving excess gravel along edge.
    f. All work must be done during daylight hours.
    g. If necessary, equipment should be parked overnight at the Town Hall on the access road.
  3. Payment. Contractor will submit a detailed claim for payment within 30 days of work performance. Claim must state dates, times, and/or roads that services were provided on. This is all inclusive and covers payment for services, salary, wages, and other personnel costs, sales and other taxes, equipment costs, and any and all other costs and expenses. The claim for payment must be submitted ONE week before the Regular Board Meeting or payment may be delayed until the following month’s Regular Board Meeting. Contractor’s attendance at the Board Meeting is requested.
  4. Independent Contractor. Contractor agrees it is an independent contractor for all purposes and nothing herein shall be construed as creating an employment relationship. Contractor, and its agents, officers, and employees are not eligible to receive workers’ compensation, unemployment insurance, or any other benefit or compensation from Town. Contractor is responsible for withholding, reporting, and paying any taxes on the payments it receives from Town.
  5. Insurance. Contractor shall maintain during the entire term of this Agreement insurance policies providing general liability coverage applicable to the services provided under this Agreement. Contractor shall also carry workers’ compensation insurance at least in the amounts and to the extent required by law. Contractor must provide Town a current Certificate of Insurance showing such coverage before starting to provide services under this Agreement. If Contractor is exempt under Minnesota law from having to carry workers’ compensation insurance, Contractor may submit a statement of exemption in place of a certificate of insurance. Town may require Contractor to provide a written statement from its insurer or agent expressing coverage for the services provided Town.
  6. Termination. Town may terminate this Agreement, with or without cause, upon 14 days written notice to Contractor. Without limitation of the foregoing, upon breach of this Agreement by Contractor, Town may immediately terminate this Agreement or may pursue any other available remedies at law or in equity that are necessary or desirable to enforce performance and observance of any obligation, agreement, or covenant of this Agreement. Contract will expire upon Town’s selection of 2023 grading contractor.
  7. Subcontracting & Assignment. Contractor shall not subcontract or assign any portion of this Agreement without prior written permission of Town.
  8. Final Payment. Final payment in the amount of 5% of the total claim may be withheld until the following
    conditions are met:
  9. Final inspection / approval by a Township Supervisor has been completed and a Town Roadwork
    Contract Completion Certificate is signed and on file with the Town Clerk.
    1. The Town clerk has received signed Lien Waivers from all suppliers and subcontractors.
  10. A copy of a signed IC-134 form from the Minnesota Department of Revenue is on file with the
    Town Clerk (when necessary).
  11. Miscellaneous.
    a. In accordance with Minnesota Statutes, Section 16C.05, subdivision 5, Contractor’s books, records, documents and accounting procedures and practices relevant to this Agreement are subject to examination by Town and the Minnesota State Auditor for a minimum of six years from the expiration date of this Agreement.

b. This Agreement has been made, and its validity, performance, and effect shall be determined in accordance with the internal laws of the State of Minnesota without regard to conflict of law provisions. Any dispute arising out of this Agreement shall be heard in the state or federal courts of Minnesota and the parties hereto waive any objection of such courts, jurisdictional or otherwise, and whether based on convenience or any other grounds.

c. The waiver by any party of a breach or violation of, or failure of any party to enforce, any provision of this Agreement shall not operate or be construed as a waiver of any subsequent breach or violation or as a relinquishment of any rights hereunder.

d. If any part of this Agreement is invalid or unenforceable under applicable law, that part shall be ineffective only to the extent of such invalidity or unenforceability without in any way affecting the remaining parts of the provision or this Agreement.

e. The parties acknowledge that they participated equally in the negotiation and drafting of this Agreement and that, accordingly, no court shall construe this Agreement more stringently against one party than the other.

f. This writing represents the entire agreement and understanding of the parties with respect to the subject matter hereof and supersedes any and all previous agreements of whatever nature between the parties with respect to the subject matter. This Agreement may not be altered or amended except by an agreement in writing signed by the parties. Without limitation of the foregoing, no claim for extra work done or materials furnished by Contractor will be made by Contractor or allowed by Town, nor shall Contractor do any work or furnish any materials not covered by this Agreement, unless such work or materials is ordered in writing by Town.

g. Notwithstanding anything to the contrary herein, nothing in this Agreement shall constitute a waiver of any immunity from or limitation on liability to which Town is entitled, under Minnesota Statues, Chapter 466 or otherwise.

h. Contractor will maintain all necessary licenses and permits and will comply with all federal, state, and local laws, rules, and regulations pertaining to Contractor’s performance under this Agreement.

i. Contractor will defend, indemnify, protect and hold harmless Town and its employees, officers, and agents from any and all claims or causes of action, including attorneys’ fees incurred by Town or its insurers, arising from any negligent or otherwise wrongful act, or omission in the performance of this Contract by Contractor or Contractor’s agents or employees.

This agreement is executed as of the date stated in the introductory clause above.